◆ PIPING
● Please keep the filtrate outlet horizontally so as not to contaminate the ground.
● Please take anti-freezing measures in case you cause damage to this equipment.
◆ Wiring
● Please turn off the power before wiring.
● Please close the lid after wiring.
● Please select professional personnel to check and wire the system.
● Please don't destroy the wire or put heavy things on the wire.
● Please select the specified voltage.
● Please install ground wire.
● Please use specified binding post.
● Please make sure to use insulation in binding post.
Power specification
Phase Number | 3 |
Voltage | 200/200/220VAC |
Mains Frequency | 50/60/60Hz |
Tolerable voltage rage of change | ±10% |
Tolerable mains frequency rate of change | ±1% |
Tolerable unbalance rate for voltage | ±2% |
1) Please follow the circuit topography to connect the power to specified binding post.
2) Please install ground wire.
3) Please confirm the parts which are connected to binding post.
4) When flocculation tank is set alone, please connect the screw press to operation board.
Binding post specification | BNH30W | BNH40W | BNH50W |
Wire specification | 5.5mm² | 8.0mm² | 14mm² |
Screw specification | M4 | M5 | M5 |
For more information or enquiry, please contact Environmech Sdn. Bhd.
Contact us: http://www.environmech.com/p/contact-us.html
Website: www.Environmech.com