Formal run
1) Check whether the polymeric flocculant has been dosed in the dosing equipment or not. Check whether the equipment can work normally and does it connect the sludge dewatering equipment well.
2) Make all switches or buttons (CSL) in off state.
3) Make operation mode (COS1) in manu state, and select corresponding switch(CSL) to see whether sludge and chemical can be feeded normally.
4) Make all switches or buttons (CSL) in off state.
5) Make 24h timer(TS-1) in auto state, and make operation mode (COS-1) change to auto mode.
6) Adjust the level controller or sludge pump to set the sludge flow rate.
7) Adjust the dosing pump, set the dosage of flocculant.
8) Check the flocs state when polymeric flocculant mixed with sludge in flocculation tank. The proper floc diameter should be 5~10mm. If can not get the ideal state, please adjust the rotation speed of mixing motor. It can be adjusted by converter(INV-2).
Reference photo for ideal flocs
9) The flocs flow into the filter cartridge and to be squeezed and pushed to sludge outlet.
The pressure inside the filter cartridge gets bigger and bigger when the flocs flow into it gradually.
It takes about 60 minutes before it becomes sludge cake.
For more information or enquiry, please contact Environmech Sdn. Bhd.
Contact us: http://www.environmech.com/p/contact-us.html
Website: www.Environmech.com