Setting for Automatic Self-cleaning Filtration System supply in Semenyih

Setting

The setting process consists of the following steps:
1) Connecting the energy source.
2) Configuration process (PLC definition).
3) Connecting the input/output devices.
4) Testing solenoids

CONNECTING THE ENERGY SOURCE
Before setting FILTRON16, the equipment required to properly connect to the power supply. If it is AC model, the equipment should be connected to
the right power according to requirement .
Two modes of plate figure such as the third part AC and DC line as shown
in figure.

NOTE: when it is DC model, avoid to miss put the positive and negative
lines in the opposite position.

When the unit is connected to the power source, it responds
immediately by showing an introductory screen as follows:


For more information or enquiry, please contact Environmech Sdn. Bhd.
Contact us: 
http://www.environmech.com/p/contact-us.html 

Website: www.Environmech.com