Commissioning for Ring Blower supply in Selangor Area


Commissioning
Notice : Lubricating a dry running machine (process chamber).
Risk of damage to the machine!
** Do not lubricate the process chamber of the machine with oil or grease.

CAUTION : During operation the surface of the machine may reach temperatures of more than 70°C.
Risk of burns!
**Avoid contact with the machine during and directly after operation.

CAUTION : Noise of running machine.
Risk of damage to hearing!
If persons are in the vicinity of a non noise insulated machine over extended periods:
  • Make sure that ear protection is being used.
  • Make sure that the installation conditions are complied with.
  • Switch on the machine.
  • Make sure that the maximum permissible number of starts does not exceed 6 starts per hour.
  • Make sure the working/pause periods are equal with multiple starts per hour.
As soon as the machine is operated under normal operating conditions:
  • Measure the motor current and record it as reference for future maintenance and troubleshooting work.
For more information or enquiry, please contact Environmech Sdn. Bhd.