Transit,deposited,safekeeping
All the fans have checked out with centre emendation,balance,running.Then was qualified to leave factory,so the client must pay attention to abrade and distortion during transit.
1) Check the parts
- Check the fans whether or not have damnification,distortion,consummate paint.
- Check the parts and spare parts.
2) Hoist and transit
- Please use the hook when transiting,perching and hoisting.
- When hoisting fission casing and rotors,fill in with soft where the rigging and work piece
touched,especially the impeller and shaft.Otherwise will debase the precision of balancing,result in the fan shaken.
- Pay attention to fix the rigging for the brass lubrication nipples are vulnerable.
- The move of equipment brings large impulsive force of shaft and impeller,please advert it.
3) Safekeeping
- The fan should be placed at the ventilation place,dry location before installation, periodic check it,so avoid rustiness and scythe.
- During the keeping period,insist on twice jigger per month at least,10 turns every time and stop at the point of over 180 ° .At the same,pay attention to the degree of bearing
lubrication.Secondly.sometimes of open and close the rotor such as adjustable door,if necessary,limit the lube in order to prevent rustiness.
- To check the lubricate after open the bearing cover if the fan haven't run for a long time,add the new lube if necessary.
For more information or enquiry, please contact Environmech Sdn. Bhd.